1 / 5
1. Power Off: Cut off the power and remove the old lamp (ensure hands are dry).
2. Installation: Install the LED bulb, ensuring the holder matches the bulb base.
3. Verification: Check the installation and switch on for performance.
| CE | Available |
| RoHS | Available |
| SASO | Available |
| SLS1231 | Available |